Victoria Gold Reports Fourth Quarter And Full Year 2020 Resu Victoria Gold Reports Fourth Quarter And Full Year 2020 Results
2021-03-23 20:24 ET - News Release
TORONTO, March 23, 2021 (GLOBE NEWSWIRE) -- Victoria Gold Corp. (TSX-VGCX) (“Victoria” or the “Company”) is pleased to announce results for the fourth quarter and year ended December 31, 2020. The Eagle Gold Mine achieved commercial production on July 1, 2020. As a result, financial results highlighted herein for the year ended December 31, 2020 are based on the 6 months from the declaration of commercial production through to December 31, 2020. Prior to achievement of commercial production, operational revenues and expenses were capitalized to long-term assets.
Gold sales were 40,023 ounces at an average realized price1 of US$1,883/oz during the fourth quarter and 72,052 ounces at an average realized price1 of US$1,882/oz, over the inaugural two quarters of commercial production. All amounts are in Canadian dollars unless otherwise indicated.
Mr. John McConnell, President and CEO commented, “As previously press released, gold production in the second half of 2020 was 77,748 ounces, which exceeded the top end of guidance. All in sustaining costs were US$1,206 over the second half of 2020, which was below the mid-point of guidance. Compared to the third quarter, the fourth quarter of 2020 achieved a 20% increase in gold production coupled with a 15% decrease in all in sustaining costs per ounce. We expect material improvements in production and unit costs to continue in 2021 as the Company benefits from recently completed operational improvements and the increasing inventory of recoverable gold on the heap leach pad. Note that due to the Company’s seasonal stacking plan, 2021 production will be weighted toward the second half of the year, as it was in 2020.”
This release should be read in conjunction with the Company’s December 31, 2020 Financial Statements and Management’s Discussion and Analysis (“MD&A”) available on the Company’s website or on SEDAR.
Operational Highlights
- Achieved commercial production at Eagle Gold Mine on July 1, 2020
- Mine production in the fourth quarter was 2.2 million tonnes of ore. Mine production for the twelve months was 7.5 million tonnes of ore.
- Ore stacked on the heap leach pad in the fourth quarter was 2.3 million tonnes at an average grade of 0.81 grams per tonne (g/t). Ore stacked for the twelve months, was 7.3 million tonnes at an average grade of 0.84 g/t.
- Gold production was 42,436 ounces in the fourth quarter. Gold production for the twelve months was 116,644 ounces.
Financial Highlights
- Gold sold in the fourth quarter was 40,023 ounces, at an average realized price1 of $2,453 (US$1,883) per ounce. Gold sold since declaration of commercial production was 72,052 ounces, at an average realized price1 of $2,480 (US$1,882) per ounce.
- Recognized revenue was $98.2 million based on sales of 40,023 ounces of gold in the fourth quarter. Recognized annual revenue since declaring commercial production was $178.7 million based on sales of 72,052 ounces of gold.
- Operating earnings were $39.8 million for the fourth quarter. Annual operating earnings were $66.9 million.
- Cash costs1 were $1,013 (US$777) per ounce and all-in sustaining costs (“AISC”)1 were $1,459 (US$1,120) per ounce of gold sold for the fourth quarter. Cash costs1 were $1,039 (US$788) per oz and all-in sustaining costs (“AISC”)1 were $1,589 (US$1,206) per ounce of gold sold since declaring commercial production.
- Free cash flow1 was $20.6 million or $0.33 per share1 in the fourth quarter. Free cash flow1 was $48.0 million or $0.78 per share1 for the 6 month period since achieving commercial production.
- Cash and cash equivalents were $56.1 million at December 31, 2020 after repaying $39.8 million of principal against the Company’s debt facilities for the year ended December 31, 2020.
_______________________________
1 Refer to “Non-IFRS Performance Measures” section.
Fourth Quarter and Full Year 2020 Operating Results
| | Three months ended December 31, 2020 | Year ended December 31,2020(1) |
Operating data | | | |
Ore mined | Tonnes | 2,247,243 | 7,529,181 |
Waste mined | Tonnes | 3,084,892 | 12,370,280 |
Total mined | Tonnes | 5,332,135 | 19,899,461 |
Strip ratio | (waste to ore) | 1.37 | 1.64 |
Mining rate | Tonnes/day | 57,997 | 54,369 |
Ore stacked on pad | Tonnes | 2,316,522 | 7,271,334 |
Ore stacked grade | g/t Au | 0.81 | 0.84 |
Throughput (stacked) | Tonnes/day | 25,174 | 19,866 |
Gold ounces produced | ounces | 42,436 | 116,644 |
Gold ounces sold | ounces | 40,023 | 102,551 |
(1) Note the disclosure of operating results and supporting discussion in this news release does not present comparative statistics for the prior year as the Eagle Gold Mine declared commercial production effective July 1, 2020.
H2 Results vs. Revised H2 2020 Guidance
| | H2 2020 Guidance | H2 2020 Results | H2 Achievement |
Gold production | ounces | 72,000 - 77,000 | 77,748 oz | Exceeded target |
AISC | US$/oz sold | $1,175 - $1,275 | $1,206/oz | Met AISC target |
Gold production and sales
During the three months ended December 31, 2020, the Eagle Gold Mine produced 42,436 ounces of gold. During the three months ended December 31, 2020, the Company sold 40,023 ounces of gold.
During the year ended December 31, 2020 the Eagle Gold Mine produced 116,644 ounces of gold. Gold sales during the year ended December 31, 2020 were 102,551 ounces.
Mining
During the three months ended December 31, 2020, a total of 2.2 million tonnes of ore were mined at Eagle, at a strip ratio of 1.4:1.0 with a total of 5.3 million tonnes of material mined.
During the year ended December 31, 2020, a total of 7.5 million tonnes of ore were mined, at a strip ratio of 1.6:1 with a total of 19.9 million tonnes of material mined.
Mining and processing activities continued to ramp up toward full production during the fourth quarter of 2020. Total tonnes mined were 19% lower in the fourth quarter versus the third quarter as a result of reduced waste mining. Waste mining was lower in the fourth quarter as considerable waste mining was advanced in the third quarter and thereby, ore mined increased by 7% quarter over quarter.
Processing
During the three months ended December 31, 2020, a total of 2.3 million tonnes of ore was stacked on the heap leach pad at an average head grade of 0.81 g/t Au. The throughput rate was approximately 25,200 tonnes of ore per day.
A total of 7.3 million tonnes of ore was processed during the year ended December 31, 2020, at an average head grade of 0.84 g/t Au and a throughput rate of approximately 19,900 tonnes per day.
Ore stacked on the heap leach pad increased by 21% over the third quarter of 2020. Ore stacked improved considerably in the fourth quarter and particularly during the second half of November through the end of the year. Both gold grade and metallurgical recoveries have reconciled well against the Eagle reserve model and a significant gold inventory is building on the heap leach pad.
As at December 31, 2020, the Company estimates there are 62,959 recoverable ounces within mineral inventory.
As of the date of this press release, a number of improvements related to material handling within the process circuit have been completed. These corrective measures are significantly improving reliability and, in turn, will improve ore stacking and gold production going forward. Optimization activities included:
Optimization Activity | Details | Progress |
Tertiary stockpile feeders and crusher feed chutes | Improved design to reduce maintenance requirements and increase productivity. | Complete |
Equipment protective wear liners | Enhanced liner design and product selection to significantly increase wear life, reduce maintenance requirements and down time. | Complete |
Control systems | Process logic upgrades to reduce nuisance trips and improve start-up times. | Complete |
Dust suppression in secondary/tertiary crusher building | Improved spillage & dust suppression to improve safety and productivity. | Complete |
Grasshopper conveyors on HLP | Increasing horse power to allow for improved capacity and production. | Complete |
Sustaining capital
The Company incurred a total of $15.8 million in sustaining capital expenditures during the three months ended December 31, 2020. Significant sustaining capital expenditures during the period included Phase 1-B heap leach facility infrastructure of $1.0 million, upgrades to the material handling system including chute liners of $7.2 million, spares for the CAT 6040 shovels of $1.0 million and capitalized stripping costs of $4.4 million.
The Company incurred a total of $35.7 million in sustaining capital expenditures during the year ended December 31, 2020. Significant sustaining capital expenditures during the period included Phase 1-B heap leach facility infrastructure of $5.4 million, upgrades to the material handling system including chute liners of $9.6 million, spares for the CAT 6040 shovels of $2.3 million and capitalized stripping costs of $11.2 million.
Fourth Quarter and Full Year 2020 Financial Results
| | Three months ended December 31, 2020 | Year ended December 31, 2020(1) |
Financial data | | | |
Revenue | $ | 98,221,599 | 178,747,827 |
Gross profit | $ | 43,159,771 | 76,315,208 |
Net income | $ | 54,851,137 | 14,891,909 |
Earnings per share - Basic | $ | 0.885 | 0.246 |
Earnings per share - Diluted | $ | 0.834 | 0.232 |
| | As at December 31, 2020 | As at December 31, 2019 |
Financial position | | | |
Cash and cash equivalents | $ | 56,136,314 | 16,882,129 |
Working capital | $ | 25,370,418 | (54,710,172) |
Property, plant and equipment | $ | 579,617,049 | 616,911,260 |
Total assets | $ | 776,760,617 | 686,615,731 |
Long-term debt | $ | 209,660,142 | 239,347,404 |
(1) Eagle Gold Mine achieved commercial production effective July 1, 2020. As such, only revenue and related cost of goods sold from this date are recognized in the Company’s consolidated statements of income (loss) and comprehensive income (loss) for the year ended December 31, 2020 and in this table. Gold sales and related costs prior to that were capitalized to mineral properties.
Revenue
During the fourth quarter, the Company sold 40,023 ounces of gold at an average realized price of $2,453 (US$1,883) (see “Non-IFRS Performance Measures” section) resulting in revenue of $98.2 million. Revenue is net of treatment and refining charges, which were $0.3 million for the fourth quarter.
Since declaring commercial production, the Company sold 72,052 ounces of gold at an average realized price of $2,480 (US$1,882) (see “Non-IFRS Performance Measures” section) resulting in revenue of $178.7 million. Revenue is net of treatment and refining charges which were $0.5 million for the 2020 year.
Cost of goods sold
Cost of goods sold of $40.9 million and $75.3 million for the fourth quarter and 2020 period respectively, are comprised of production costs, (including mining, processing, site services and site general and administration costs), royalty and selling costs.
Depreciation and depletion
Depreciation and depletion was $14.1 million and $27.1 million for the fourth quarter and 2020 period respectively. Assets are depreciated on a straight-line basis over their useful life, or depleted on a units-of-production basis over the reserves to which they relate.
Net income
The Company reported income of $54.9 million for the fourth quarter 2020, compared to income of $10.1 million for the previous years comparable period. The increase in net income is the result of operating earnings, unrealized and realized gains on derivative instruments, foreign exchange gains and current income taxes, partially offset by finance costs and deferred taxes.
The Company reported income of $14.9 million for the 2020 year, compared to a loss of $9.8 million for the previous year. The increase in net income is the result of operating earnings, unrealized gains on marketable securities, foreign exchange gains and income from a prior period sale, partially offset by finance costs, unrealized and realized losses on derivative instruments and current and deferred taxes.
Liquidity and Capital Resources
At December 31, 2020, the Company had cash and cash equivalents of $56.1 million and a working capital surplus of $25.4 million. The increase in cash and cash equivalents of $39.3 million, was due to operating activities and changes in working capital including foreign exchange losses on cash balances ($111.4 million increase in cash), partially offset by investing activities ($63.8 million decrease in cash) from construction and sustaining capital for the Eagle Gold Mine, net of amounts received from a prior period sale and a release of restricted cash requirements and financing activities ($8.3 million decrease in cash) from principal and interest repayments made on credit facilities, net of amounts received from share issuances.
2021 Outlook
Victoria’s operational outlook assumes that operations will continue without any significant COVID-19 related interruptions. The Company continues to maintain preventative measures at site to protect our workforce and communities, and to mitigate the effects of COVID-19 on our operations. Any reduction or suspension of our operations due to COVID-19, could impact our ability to achieve the Company’s 2021 outlook.
Gold production at the Eagle Gold Mine for 2021 is estimated to be between 180,000 to 200,000 ounces. Mining, crushing and ore stacking on the heap leach pad are all expected to operate at full capacity during 2021 while gold production, which lags mining and stacking activities in heap leach operations, will continue to build up through the first half of 2021 reaching full capacity in the second half of 2021. Gold production will be strongly weighted to the second half of the year due to seasonal stacking of ore on the Eagle leach pad, which is curtailed for the 90 coldest days of the year, January through March. During this no stacking period, mining operations, primary crushing and stockpiling of ore continues with ongoing leaching and gold production. Subject to favourable weather conditions, ore stacking may be resumed ahead of schedule.
AISC for 2021 are expected to be between US$1,050 and US$1,175 per ounce of gold sold. Sustaining capital is estimated at US$47 million for 2021. Sustaining capital will be high in 2021 compared with future years due to one-time infrastructure expenditures including construction of the truck shop (US$8 million) and water treatment plant (US$11 million).
Waste stripping is included in AISC but is not included in the estimated sustaining capital above. Waste stripping will be expensed or capitalized based on the actual quarterly stripping ratio versus the expected life of mine stripping ratio. This accounting treatment for waste stripping will affect earnings and sustaining capital but will not affect AISC or cash flow.
Exploration spending in 2021 is estimated to be US$10 million and is considered growth capital.
Qualified Person
The technical content of this news release has been reviewed and approved by Paul D. Gray, P.Geo, as the “Qualified Person” as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
Conference Call and Webcast Details
Participant Access Information |
Please join the event 5-10 minutes prior to scheduled start time. When prompted, provide the confirmation code or event title.
Moderator Name: | John McConnell (Event) |
Company Name: | Victoria Gold Corp. |
Event Conference Title: | VGCX Year-end 2020 Results Conference Call |
Time Zone: | Pacific Time (US & Canada) |
Start Time/Date: | 09:00 Wednesday, March 24, 2021 |
Duration: | 60 minutes |
| |
Conference ID: | 4283746 |
Dial in:
Location | Purpose | Phone Type | Phone Number |
Event Plus Dial-In Number: | Participant | Tollfree/Freephone | (833) 670-0707 |
Event Plus Toll Dial-In Number | Participant | Toll Dial-in | (236) 714-2922 |
About the Dublin Gulch Property
Victoria Gold’s 100%-owned Dublin Gulch gold property (the “Property”) is situated in central Yukon Territory, Canada, approximately 375 kilometers north of the capital city of Whitehorse, and approximately 85 kilometers from the town of Mayo. The Property is accessible by road year round, and is connected to Yukon Energy’s electrical grid.
The Property covers an area of approximately 555 square kilometers, and is the site of the Company’s Eagle and Olive Gold Deposits. The Eagle Gold Mine is Yukon’s newest operating gold mine. The Eagle and Olive deposits include Proven and Probable Reserves of 3.3 million ounces of gold from 155 million tonnes of ore with a grade of 0.65 grams of gold per tonne, as outlined in a National Instrument 43-101 Technical Report for the Eagle Gold Mine dated December 3, 2019. The Mineral Resource under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) for the Eagle and Olive deposits has been estimated to host 227 million tonnes averaging 0.67 grams of gold per tonne, containing 4.7 million ounces of gold in the “Measured and Indicated” category, inclusive of Proven and Probable Reserves, and a further 28 million tonnes averaging 0.65 grams of gold per tonne, containing 0.6 million ounces of gold in the “Inferred” category.