Could be Eniga profitable?? Made some reasearch by reading the Eniga technical report.
Test Area 2019
The crucial assays are from the large bulk samples EGTPS6A and 6B. 6A probably directly from swale (wet rock and higher density); Trench6A is 52m and Trench6b is 86m. Trench 6B is probably the edge. The bulk samples were taken 4 m wide and approx. 2 m deep. In total, this results in an average head grade of 0.84 g / m³, converted to approx. 0.5 g / t. So far so good. recovery im swale 86% for test plant okay. Outside of the swales probably rather uninteresting. 59% recovery and headgrade weak.
Mak Samples 2020
It gets more exciting with the Mak Samples from this year in the north-west of the Mining License. These are much better than those from the test area 2019. A lot of pink (> 42 gold specs / t) and red points. In addition, the expansion seems to be much larger. This suggests significantly better results for the following Bulksamples.
The new Swales in Paradise also look promising.
Conclusion:
still very very early days. The chances are good that Egina could produce very economically by comparing the grade of the average alluvial gold producer. everything depends on scalability. Potential infinite.
Peter