RE:Peter what's the problem? 100m pit is no depth. Stripp off not more than 1:1.
for Open pit 460k oz indicated with 2.1 g/t, 270k wirh 2.7 g//t. All above 1.5 g/t will be very profitable. potential for open pit is fine.
For underground much more Ressources have to proved. 5 g/t okay, but not more. Probability low because of conglomerate style. Underground Capex Risk to High to make it without jorc.
peter
WailingWally wrote: Being the new guy how about your thoughts on this. Its a slow day, but its also an almost Friday afterall. And we cant let that go by without making some trouble.
Our bass player says this:
See the scale bar at the bottom. So the gold bearing zones come to surface only at the edge. The rest is covered with up to 60 m of over burden. https://www.novoresources.com/_resources/presentations/corporate-presentation.pdf pgs 17 and 18 .