The Berenguela Project- 127 million oz Ag 770 million lbs CuThe Berenguela Project has 770 million lbs of copper and 127 million oz of silver in resource. The measured/indicated reserves grade 0.98%/t Cu. In perspective the average copper mine grades around 0.53%/t and developing copper projects grade 0.39%/t. The copper component in resource at Berenguela is valued at $3 billion with silver at $3.3 billion and $0.3 billion zinc. This gives you a perspective of how it is a proxy on copper and silver. Aftermath Silver needs to review previous exploration data. IMHO they definitely have a mine. The resource is only scratching the surface of their concession.