I though that this would give some excitement to the Bullboa On a per-ounce sold basis, average unit costs over the LOM are expected to include operating cash costs per ounce sold of $619 and AISC per ounce sold of $821. Unit costs in the first five years of the operation are expected to be better than the LOM averages and clearly establish the Detour Lake mine as a low-cost gold mining operation with operating cash costs of $524 and AISC per ounce sold of $775.
OPERATING SUMMARY (1) 2021-2025 Mining Ore mined (Mt) 186.4 Waste mined (Mt) 386.9 Ex pit mined (Mt) 573.3 Strip ratio (waste/ore) 2.08 Ex pit ore grade (g/t) 0.78 Processing Tonnes milled (Mt) 132.8 Head grade (g/t) 0.92 Recovery (%) 92.0 Gold recovered (Koz) 3,618 Gold poured (Koz) 3,618 Gold sales (Koz) 3,618 Unit costs Operating cash cost ($/oz) 524 AISC ($/oz) 775 (1) Tonnes and ounces are based on mineral reserves and mineral JUst to say: $ 775 AISC at Detour is outstanding and Average AISC for Macassa/Fosterville/Detour to be $ 578/$ 600 from the $ 800 currently.The only interrogation point From what year or from 2021 to 2025