SMART PLAN ?DEC - already has two corner zones drilled.
They simply need another 3 holes to scare the beeejezus out of Teution
and go for the 75%...lol
2 holes in opposite kiddiecorner position to frame the 500m square.
one hole taps the center.
The 3 kozko holes are relatively shallow.
31 + 32 meter intercepts....
these are on an pich - which means the true depth of where minerlaization bergins is
much shallower....which makes for cheap drilling.
Which means...
Why not stick to the kozko zone and tarhet the shallower intercepts
= more meter drill value
if this kozko zone is only 50m deep and the minerlaization is in the 30m range...
Then... beginning a whole new drill campaign around the kozko zone
woukd allow dec- far more drill meters....and... equate to a potential ultra near surface mineral body..
25 holes x 80m = 2,000 meters....( holes every 100m grid )
Use - light drilling to reduce costs - what would be the wait ?
Heli - port a 4 wheeler and trailer - skid the - drill pad + equipt - to each 100m drill zone.
Instead of using a heli for each move.. .save on costs....I read another junior using light drilling only cost $50/meter.... Maybe deccould swing it for $200/k - it's what i would do....to escape this hold down - if they were ever successful... they'd be laughing all the way....i would think another would be pulling the crying towel forward... lol
Cheers...