RE:newsseveneleven711, Thanks for the link. Impressive news.
Just wanted to add the following notes:
- They have achieved the 5MozAuEq with just with the OP alone.
- The grade has not reach the target grade 5gpt (4.3gptAuEq), but the grade of above 4 gpt for OP is high enough for an OP operation. Besides, the RE is a lot more important than the 5 gpt (a mooth point) for the definition to become of Tier 1 (Barrick is saying this out loud, but it may just just be part of they bluffing strategy in playing this poker game).
- SNIP with a guess of 1Moz has not been included in the estimate. Ditto for Albino Lake with a frction of 1Moz, say 0.2Moz. Apparently they have finished drill at Albino.
- To be on the conservative side, with SNIP and Albino and further exploration of other zones would push SKE total RE toward 7Moz AuEq.
GH11
-----------------------
seveneleven711 wrote: https://ceo.ca/@accesswire/skeena-announces-53-moz-at-43-gt-aueq-measured-and