RE:Zinc8 signs A Host Site Agreement with NYPA & U of Buffalo
"Zinc8's 100kW/1MWh behind-the-meter energy storage system being installed at UB will serve to demonstrate the long-duration aspect of the energy storage system, to validate the performance reliability of the system, demonstrate the peak shaving capability, determine the O&M cost and to determine the estimated life cycle cost." Sounds really good. If the battery performs well it will be a great advertising for the product.