RE:Sept 26 2019 back to topIn 2019 based on an airborne LIDAR survey they guessed 8200 m2 area with depth 15 to 25 meters. Now in 2021 after trenching and drilling they realize the entire waste pile was only ...25K cubic yards... Now it turns out to be way smaller you are trying to revert to the pre-trench and pre-drill ballpark stab? Oops?
"The Company has now completed a conservative volume estimate using trenching, ground percussion drilling and airborne survey imagery of the stockpile area. The first of numerous historical stockpiles contains approximately >25,000 cubic yards, which consists primarily of historical stamp mill tailings material."