RE:RE:11 May ORO/Adam Smith YT video ... San Diego Torrey Hillsjust a word of caution, and I am long till buyout. ....within weeks means by june july most likely drilling by July if we are lucky to get a permit by end of June. Think of it like drilling by end of July, results by end of October, and then you dont worry so much. We have been told permits are coming mid May but it always takes longer than anyone thinks, especially in Mexico. So permits by late June, if we are lucky, drilling in July sometime. results in October with meaningful assay results. Then we can fly. and all of 2022 is drilling drilling and drilling.
coppermonster wrote: Highlights start at ~32min
- 3DIP results in May
- Permit and drilling "within weeks."