Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

ProShares Short SmallCap600 T.SBB


Primary Symbol: SBB

The investment seeks daily investment results that correspond to the inverse (-1x) of the daily performance of the S&P SmallCap 600 Index. The fund invests in financial instruments that ProShare Advisors believes, in combination, should produce daily returns consistent with the funds investment objective. The index is a measure of small-cap company U.S. stock market performance. It is a float-adjusted, market capitalization-weighted index of 600 U.S. operating companies selected through a process that factors in criteria such as liquidity, price, market capitalization, financial viability and public float. The fund is non-diversified.


ARCA:SBB - Post by User

Post by goodheart-ron May 17, 2021 1:25pm
221 Views
Post# 33214803

site update May 17

site update May 17Site Development Update: During the first quarter, much has been advanced on the project, including the following: • Procurement of the initial surface mining fleet for the first year of pit development consisting of seven 64 tonne haul trucks with associated drilling, loading and support equipment. Procurement of phase I of the permanent accommodation complex (287 beds), building steel and cladding for the process plant, crusher building and truck shop, construction equipment necessary for concrete placement and building erection as well as equipment required for winter ice road construction. Sabina is also working with a logistics specialist (air and sealift) to finalize the execution strategy for mobilizing goods and equipment to site. • Site civil works continue including ground support of the box cut face which Sabina is developing for the underground exploration ramp and harvesting of esker material for concrete production and plant site preparation work. • The erection of a 60’ x 100’ underground shop has been completed and installation of site services for power and compressed air supply for underground activities is ongoing. • 1,800 meters of a planned 4,000 meter exploration drilling program has been completed. • Necessary geotechnical drilling of proposed water containment areas is finished. To facilitate this work, transportation of over one million litres of fuel and 1.5 million pounds of supplies and consumables for surface civil works has also been completed. Engineering Update: Detailed engineering is approximately 75% complete and is expected to be completed in late Q2 with issued for construction drawings and finalized vendor interfaces. Sabina has also entered into a contract with FLSmidth to complete the engineered design and fixed pricing for the plant, including commissioning, training and spare requirements. Sabina is also continuing to negotiate a performance guarantee on plant equipment. The Company has also engaged an artic experienced constructor who has completed constructability reviews and is developing an execution plan focused on providing a fixed price bid on construction deliverables.
<< Previous
Bullboard Posts
Next >>