RE:RE:News releaseAt the higher cutoff, 1.25/tonne the GMV of the deposit is $ 1B. Using the lower cutoff, .65 the it is $1.6B Add in Kwankia
uggg their update presentation breaks it out 350M lbs of copper equivalent of which 96% is recoverable. A great start pit if you will to increase the IRR and payback