Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Banyan Gold Corp V.BYN

Alternate Symbol(s):  BYAGF

Banyan Gold Corp. is a Canada-based company, which is engaged in the business of exploration and development of mineral property. The Company holds three main projects in the mining friendly Yukon Territory: AurMac Project, Nitra Claims and Hyland Gold Project. The Company’s flagship asset is AurMac Gold Project located in the Mayo Mining District. It has earned a 51% and 75% interest in and has the right to earn a 100% interest in each of the Aurex Property and McQuesten Property subject to certain royalties. The AurMac Project covers over 173 square kilometers (km2). The Nitra Gold Project is located in the Mayo Mining district, approximately 10 kilometers west of the AurMac Gold property, within the traditional territory of the First Nation of Na-Cho Nyak Dun. The Nitra Gold Project has around 1,442 claims (296 km2). The Hyland Gold Project consists of 927 active Yukon registered quartz mineral claims totaling over 18,620 hectares in an area that is road accessible from Watson Lake.


TSXV:BYN - Post by User

Post by Bluetickon May 18, 2021 7:11am
151 Views
Post# 33220447

NEWS

NEWS

Banyan Gold Drills 0.73 g/t Gold Over 56.6 Metres with Continued Expansion of Powerline Mineralization, Aurmac Property, Yukon

  •  
  •  
  •  
  •  
  •  

VANCOUVER, BC / ACCESSWIRE / May 18, 2021 / Banyan Gold Corp. (the "Company" or "Banyan") (TSXV: BYN) is pleased to announce the results from the next five (5) diamond drill holes received from the 2021 exploration program on the AurMac Property, Yukon. These drill holes continue step out to the south of the Powerline deposit on systematic 100 metre ("m") centered grid drilling designed to test the expansion potential of the Powerline Deposit.

Assay highlights from these five (5) 2021 Powerline Zone drill holes results include:

  • 0.73 g/t Au over 56.6 metres from 38.1 m in AX-21-75

  • 0.55 g/t Au over 81.2 metres from 86.5 m in AX-21-73

  • 0.37 g/t Au over 129.3 metres from surface in AX-21-77

"Gold mineralization encountered to date is remarkably consistent, and these latest holes, combined with previous results, served to greatly expand the Powerline Deposit to the south." stated Tara Christie, President and CEO. "The Sections included with this news release, and on our website, demonstrate the mineralization now extends over an expansive area with mineralization showing exceptional potential for growth in all directions and in particular towards the Aurex Hill Zone. Drilling at the Aurex Hill Zone, the next high-priority target on the large 173km2 Aurmac Property, is planned to commence in the next few weeks. Banyan is excited to apply the successful AurMac Mineralization Model to yet another target on this rapidly developing Project."

Image 1 shows a photograph of visible gold from Hole AX-21-75, which assayed 17.9 g/t over 0.6 m.

Figure 1 shows the current status of the 2021 drill program at Powerline and Aurex Hill. The locations of drill holes presented in this news release are shown on Figure 2 and sections with results are shown in Figures 3-7. Tables of complete results with collar locations are located on our website and will be updated regularly to include new results.

Image 1: Photograph of visible gold at 69.6 m in hole AX-21-75 (17.9 g/t Au over 0.6 m).


Figure 1: 2021 Drill program at Powerline and Aurex Hill, showing historic, completed (RC, Percussion, RAB and diamond drill holes) and planned diamond drill holes.

Figure 2: Plan map of Powerline Zone 2021 drill holes reported, planned and completed.

Figure 3: Section A to A' of Powerline (looking west)

Figure 4: Section B to B' of Powerline (looking west)

Figure 5: Section C to C' of Powerline (looking west)

Figure 6: Section D to D' of Powerline (looking west)

Figure 7: Section E to E' of Powerline (Looking west)

Table 1: 2021 Highlighted Powerline Diamond Drill Analytical Results

Hole ID

From
(m)

To
(m)

Interval*
(m)

Au
(g/t)

AX-21-73

22.6

23.6

1.0

1.05

and

36.6

45.7

9.1

0.40

including

44.2

45.7

1.5

1.08

and

86.5

167.7

81.2

0.55

including

93.0

94.5

1.5

1.24

including

100.6

103.4

2.8

2.91

including

106.6

107.4

0.8

7.16

including

112.8

114.3

1.5

1.28

including

128.6

129.5

0.9

2.21

including

132.6

133.5

0.9

3.61

including

134.4

134.8

0.4

5.47

including

137.8

139.2

1.4

1.78

         

AX-21-74

17.9

48.8

30.9

0.21

and

74.7

77.0

2.3

0.67

and

159.0

179.1

20.1

0.22

         

AX-21-75

38.1

94.7

56.6

0.73

including

51.8

53.3

1.5

1.91

including

54.9

58.1

3.2

1.22

including

69.6

70.5

0.9

17.9

including

79.3

80.8

1.5

1.04

including

94.2

94.7

0.5

5.48

and

109.9

111.3

1.4

1.06

         

AX-21-76

16.8

83.8

67.0

0.15

and

151.6

185.3

33.7

0.26

including

182.5

183.9

1.4

2.19

         

AX-21-77

12.2

141.5

129.3

0.37

including

57.9

59.4

1.5

1.55

including

70.2

71.6

1.4

1.12

including

77.7

79.3

1.6

1.17

including

94.5

95.9

1.4

5.28

including

116.5

117.4

0.9

1.56

including

167.5

169.0

1.5

1.01

         

* True widths are estimated to be greater than 90% of the reported intervals.

2021 Drilling Program Update

As of May 16, 2021, Banyan has completed over 34 drill holes for >7,200 m on the Powerline Zone of the AurMac property. Drilling planned for 2021 Phase 1 is focused on the Powerline and Aurex Hill Zones.

Analytical Method

All drill core splits reported in this news release were analyzed at SGS Canada in Vancouver, B.C. utilizing their GE_IMS21B20 analytical package which comprises a two-acid aqua regia digestion followed by a 36-element ICP-MS scan, in conjunction with the GE_FAA30V5 30g Fire Assay with AAS finish for gold on all samples. Samples with gold content exceeding the analytical thresholds of this package were reanalyzed utilizing an additional 30g Fire Assay Gravimetric Finish (SGS Package GO_FAG30V). All core samples were split on-site at Banyan's core processing facilities. Once split, half samples were placed back in the core boxes with the other half of split samples sealed in poly bags with one part of a three-part sample tag inserted within. Samples were delivered by Banyan personnel or a dedicated expediter to the SGS, Whitehorse preparatory laboratory where samples are prepared and then shipped to Bureau Veritas's Analytical laboratory in Vancouver, B.C. for pulverization and final chemical analysis. A robust system of standards, ¼ core duplicates and blanks was implemented in the 2021 exploration drilling program and was monitored as chemical assay data became available.

Upcoming Catalysts

May 18 - Virtual Mines and Money Online Roadshow

June 2 - Adelaide Capital Webinar - VGCX, BYN, AXU Fireside Chat on the Mayo Area: An Emerging Metallogenic District in Central Yukon, with John McConnell, Tara Christie and Clynt Nauman

Qualified Person

Paul D. Gray, P.Geo., Vice President of Exploration for the Company, is a "qualified person" as ‎defined under NI 43-101 and has reviewed and approved the content of this news release.‎

COVID-19 Update

Banyan has taken proactive measures to protect the health and safety of our employees and communities from COVID 19 and exploration activities in 2021 will have additional safety measures in place, following and exceeding all the recommendations made by the Yukon's Chief Medical Officer.

About Banyan

Banyan's primary asset AurMac is adjacent to Victoria Gold's new Eagle Gold Mine, in Canada's Yukon Territory, which announced commercial production on July 1, 2020. The AurMac initial resource of 903,945 oz Au (see Table 2 below) was announced in May 2020. Our major strategic shareholders include Alexco Resource Corp, Victoria Gold Corporation and Osisko Development. Banyan is focused on gold exploration projects that have the geological potential, size of land package and proximity to infrastructure that is advantageous for a mineral project to have potential to become a mine. Our Yukon based projects both fit this model and our objective is to gain shareholder value by advancing projects in our pipeline.

The 173 sq km AurMac Property lies 30 km from Victoria Gold's Eagle Project and adjacent to Alexco's Keno Hill Silver District and is highly prospective for structurally controlled, intrusion related gold-silver mineralization. The property is located adjacent to the main Yukon highway and just off the main access road to the Victoria Gold open-pit, heap leach Eagle Gold mine. The AurMac Property benefits from a 3-phase powerline, existing Yukon Energy Corp. switching power station and cell phone coverage. Banyan has optioned the properties from Victoria Gold and Alexco respectively with a right to earn up to a 100% subject to royalties.

The 2020 Initial Mineral Resource Estimate prepared in accordance with National Instrument 43-101 ("NI 43-101") guidelines for the AurMac Property is 903,945 ‎ounces of gold. It is a near surface, road accessible pit constrained Mineral Resource contained in two near/on-surface deposits: The Airstrip and Powerline deposits. The Mineral Resource is summarized in Table 2 below.

Table 2: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off - AurMac Property

Deposit

Classification

Tonnage
Tonnes

Average Au Grade
g/t

Au Content
oz

Airstrip

Inferred

45,997,911

0.524

774,926

Powerline

Inferred

6,578,609

0.610

129,019

Total Combined

Inferred

52,576,520

0.535

903,945

         

Notes: ‎

  1. The effective date for the Mineral Resource is May 25, 2020.

  2. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing,changes in global gold markets or other relevant issues.

  3. The CIM definitions were followed for classification of Mineral Resources. The quantity and grade of reported inferred Mineral Resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these inferred Mineral Resources as an ‎indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an ‎indicated or measured Mineral Resource category.

  4. Mineral Resources are reported at a cut-off grade of 0.2 g/t Au, using a US$/CAN$ exchange rate of 0.75 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,500/ounce, US$1.50/t mining cost, US$2.00/t processing cost, US$2.50/t G+A, 80% heap leach recoveries, and 45° pit slop.

  5. Mineral Resource Estimate prepared in accordance with 43-101 guidelines by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc, with technical report filed July 7,2020.

The Hyland Gold Project, located 70 km NE of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt is a sediment hosted, structurally controlled, intrusion related gold deposit, with a large land package (over 125 sq km), with the resource contained in the Main Zone area (900 m x 600 m) daylighting at surface and numerous other known surface gold targets. The Main Zone oxide zone is amenable to heap leach open pit mining, with column leach recoveries of 86%. The project has an existing gravel access road.

Table 3 shows the Hyland Main Zone Indicated Gold Resource Estimate, prepared in accordance with NI 43-101, at a 0.3 g/t gold equivalent cutoff, contains 8.6 million tonnes grading 0.85 g/t AuEq for 236,000 AuEq ounces with an Inferred Mineral Resource of 10.8 million tonnes grading 0.83 g/t AuEq for 288,000 AuEq ounces. NI 43-101 prepared by Robert Carne, Allan Armitage and Paul Gray on May 1, 2018.

Table 3: Hyland Main Zone Indicated Gold Resource Estimate

Cut-off
Grade
(AuEq g/t)

In situ Tonnes

Au

Ag

AuEq

Grade
(g/t)

Ozs

Grade
(g/t)

Ozs

Grade
(g/t)

Ozs

Indicated

0.3

8,637,000

0.78

216,000

7.04

1,954,000

0.85

236,000

Inferred

0.3

10,784,000

0.77

266,000

5.32

1,845,000

0.83

288,000

               

Notes: ‎

  1. Mineral resources which are not mineral reserves do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate.

  2. Mineral resources are reported at a cut-off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au, $17.00/oz Ag and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors for difference in metallurgical recoveries of gold and silver. This information can only be derived from definitive metallurgical testing which has yet to be completed.

Banyan trades on the TSX-Venture Exchange under the symbol "BYN". For more information, please visit the corporate website at www.BanyanGold.com or contact the Company.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"

Tara Christie
President & CEO           .........Bluetick

<< Previous
Bullboard Posts
Next >>