Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Monument Mining Ltd V.MMY

Alternate Symbol(s):  MMTMF

Monument Mining Limited is a Canadian gold producer that 100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the Murchison area of Western Australia. It has a 20% interest in Tuckanarra Gold Project, jointly owned with Odyssey Gold Ltd in the same region. Located in the Central Gold Belt of Western Malaysia, the Selinsing Gold Mine covers a total area of approximately 150.3 square kilometers (km2) and includes the Selinsing, Buffalo Reef, Felda Land, Peranggih and Famehub properties. The Murchison Gold Project includes the Burnakura, Gabanintha, and Tuckanarra properties, which are located in the Murchison goldfield of Western Australia, 40 kilometers (km) southeast of Meekatharra and approximately 765km northeast of Perth. Buffalo Reef lies continuously and contiguously along the gold trend upon which the Selinsing Gold Property is located. Both Felda and Famehub are located east and north of the Selinsing and Buffalo Reef properties.


TSXV:MMY - Post by User

Post by nozzpackon May 19, 2021 6:56am
144 Views
Post# 33228320

Visible Gold..ATW discovers new gold zone at Burnakura

Visible Gold..ATW discovers new gold zone at BurnakuraBeneath NOA 2 pit .
I don't think that this zone has ever  been mined, so the high grade gold is still there..

Vancouver — Visible gold has been found in high-grade inter- sections at ATW Venture’s (ATW-V, ATWVF-o) Burnakura project in Western Australia.

ATW is refurbishing the old infrastructure and developing new underground workings at Burnakura, which is in the West Yilgarn goldfields.

The company is targeting production for March 2009 and plans to produce 35,000 oz. gold annually.

A recent 20-hole drill program designed to extend the NOA 2 deposit to the north and downplunge has done one better:

results indicate the presence of a new ore zone within access of the current underground workings.

The latest strong intercept came from hole 12: 16 grams gold per tonne over 23.7 metres, including 51.65 grams gold over 6.5 metres, from 123 metres down-hole.

Three other drill holes reported in the same news release also hit the new zone but returned only short intercepts. For example, hole 7 cut three intercepts: 0.5 metre grading 1.54 gram gold, 0.5 metre of 1.48 grams gold, and 1 metre of 1.21 grams gold.

In mid-September, ATW announced the first results from this new zone, which were more consistent.

Intercepts included 15.6 metres grading 13.37 grams gold, 4.3 metres of 5.92 grams gold, 3 metres grading 12.78 grams gold, 7.5 metres of 10.93 grams gold, and 4.5 metres grading 9.09 grams gold.

The new zone is 6 to 25 metres in apparent width, with gold mineralization confined to the diorite that hosts quartz vein stockwork.


It is open in all directions; ATW is now drilling updip.

The company is also revising its mine development plans to incorporate the area early on in mining, since the zone exhibits grades that are roughly 60% higher than the average grade in the NOA 2 deposit.

The project is home to a fully permitted carbon-in-leach (CIL) gold plant that can process 160,000 tonnes per year, as well as rolling stock, underground equipment, and a 90-man camp. ATW has finished rebuilding the crushing circuit and is now refurbishing the plant and building a gold recovery room.

The project comprises 15 historical open pits along a 12-km mesothermal shear zone. Historical mining concentrated only on oxidized mineralization.

 
<< Previous
Bullboard Posts
Next >>