Skeena Intersects 155.76 g/t Au Over 3.22 Metres at Snip Gol Skeena Intersects 155.76 g/t Au Over 3.22 Metres at Snip Gold Project
VANCOUVER, BC / ACCESSWIRE / May 20, 2021 / Skeena Resources Limited (TSX:SKE)(OTCQX:SKREF) ("Skeena" or the "Company") is pleased to report diamond drill core results from the 2021 Phase 3 infill and exploration drilling program at the Snip gold project ("Snip" or the "Project") located in the Golden Triangle of British Columbia. The Phase 3 program is designed to upgrade areas of existing Inferred resources from the Company's 2020 Mineral Resource Estimate (MRE), to the Measured and Indicated categories. Reference images are presented at the end of this release as well as on the Company's website.
Snip 2021 Phase 3 Drilling Highlights:
- 155.76 g/t Au over 3.22 m (S21-076)
- 140.50 g/t Au over 0.50 m (S21-078)
- 8.40 g/t Au over 3.00 m (S21-080)
- 61.30 g/t Au over 0.50 m (S21-083)
True widths range from 60-90% of reported core lengths. Length weighted Au composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au assays informing the length-weighted Au composites. Samples below detection limit were nulled to a value of zero.
New High-Grade Mineralization Intersected Below Twin Zone
Situated in the footwall sediments below the Twin Zone, occurrences of high tenor, vein-hosted mineralization have been intersected grading 155.76 g/t Au over 3.22 m including 376.00 g/t Au over 0.89 m and 194.00 g/t Au over 0.83 m (S21-076), and 140.50 g/t Au over 0.50 m (S21-078). These surface-based drill holes were targeting Inferred resources hosted by footwall veins that were previously only populated by widely spaced, selectively sampled historical drill holes in this area of the deposit. The new high-grade mineralization, defined by S21-076, occurs hanging-wall to the known footwall veins.
Additional footwall vein-hosted mineralization was also encountered by surface drill hole S21-080 which intersected 8.40 g/t Au over 3.00 m including 12.20 g/t Au over 1.50 m. This drill hole intersection occurs 100 m northwest S21-076 and correlates spatially with the modelled resources.
2021 Phase 3 Program Description
The 2021 drilling program at Snip is designed to convert Inferred resources from the Company's 2020 MRE to higher confidence categories (Measured and Indicated) through surface and underground drilling. Dedicated geotechnical drilling is also being completed at the Project. Approximately 3,100 m of surface-based drilling and 8,000 m of underground drilling remain to be completed in 2021. The Company is currently operating two underground rigs at Snip and additional surface rigs will be added once permits are received.
About Skeena
Skeena Resources Limited is a Canadian mining exploration company focused on revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a robust Preliminary Economic Assessment in late 2019 and is currently focused on infill and exploration drilling to advance Eskay Creek to full Feasibility by Q1 2022. Additionally, Skeena continues exploration programs at the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
Walter Coles Jr.
President & CEO
__________________________________________________________
Perhaps this will get their potential partner to invest in Snip?