Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Silver Tiger Metals Inc V.SLVR

Alternate Symbol(s):  SLVTF

Silver Tiger Metals Inc. is a Canadian company engaged in discovering, financing and building epithermal silver projects in Mexico. The Company’s 100% owned 28,414 hectare El Tigre Mining District is located in Sonora, Mexico. The El Tigre mine district is located in Sonora, Mexico and lies at the northern end of the Sierra Madre silver and gold belt which hosts many epithermal silver and gold deposits, including Dolores, Santa Elena and Las Chispas at the northern end. The Company is focused on mining high-grade silver veins in the area with production coming from three parallel veins, the El Tigre Vein, the Seitz Kelley Vein and the Sooy Vein. The El Tigre Project includes the El Tigre Veins, El Tigre Tailings and the El Tigre Low-Grade Stockpile. The Company owns royalty-free, 100% of the 6,238 hectares land-package encompassing the footprint of the proposed mining operation with no Ejido presence.


TSXV:SLVR - Post by User

Post by 666999on May 20, 2021 3:51pm
242 Views
Post# 33242042

Sprott

SprottToday’s bonanza headline is another monster with 1.3m @ 3,000g/t AgEq within the broader 14.8m interval @ 463g/t AgEq. Interestingly this twin designed to improve core recovery returned higher grades than previous 2m @ 1,443g/t AgEq, confirming consistency of mineralization with potential for improved grades as drillers ‘get settled’. Step outs to the south on the Sooy Vein continue to hit between 330m and 1km further south— validating that the entire strike is mineralized. Not just strike and grade today, but the widths continue to average >1.5m minimum mining and we do see broader ~6-15m haloes allowing higher-rate mechanized mining, enabling the asset to support higher TPD than peers with narrower systems
<< Previous
Bullboard Posts
Next >>