RE:Some fun calculations re Test Ore re commissioning....Imagine when they start working the
"good stuff"; some people are gonna need fresh batteries in their pacemaker(s).
rockingrooster wrote: 63,000 tons @ 1.19 g/t Gold = 2,640 ounces x 1900 usd =$5,016,000
@ 37.73 g/t Silver = 83,680 ounces x 28.00 usd = $2,343,000
Total $ 7,359,000
At 2,000 tons a day = approx 1 month to process.Not too bad.
Mining operations are proceeding and there are now approximately 63,000 tonnes of ore on the ROM ore stockpile, in-pit stockpile, and crushed ore stockpile as at the date of this MD&A. Much of the ore is low to marginal grade which was mined to expose the higher-grade mineralized resource during waste stripping and bench forming and is being used as test ore for commissioning the plant. The stockpiles have an average grade of 1.19 g/t gold and 37.73 g/t silver.