RE:NLC ReleaseHi allyboys,
NLC has finished drilling this season, since it is now WINTER in south american. Also NLC never mentioned that they are drilling, so I assume that hole R-26 is one of the holes they planned to do in 2019, but ran out of time due to drilling difficulty, although they planned to drill up to 300 meters, R-24 only reached 160 meters, R-25 reached 265 meters. This time R-26 reached 362 meters. I am sure they will drill deeper for the production holes.
In the south part of the project, they drilled up to 600 meters, R24/R25/R26 are on the norther portion of the project, the deepest one was 100 meters, that's why they only used 100 meters for the resource calculation.
tiger
allyboys wrote: Thank you. Does NLC mean they are still drilling or are releasing more holes, given - Every new drill hole intercepted high-grage brine at depth of 362 meters ---. Further, all the deeper and off-strike drill holes ---. How many previous holes went down to 362 meters and how many of these 362 meters deep holes were off-strike? At this time I am becoming more confidence in NLC. With FL, greater confidence will occur when infill drilling is released.