RE:RE:RE:RE:RE:Albino Waste DumpRidgeback,
(1) Please post the link for Taylo Dart's article. Thanks.
(2) 400,000 oz sounds reasonable (at $3.5/tonne to dig up compared to 180/tonne for SNIP). The profit would be more than enough to cover the CapEx for the entire Eskay project. There are some estimates, on ceo.ca, ranging from 400,000 oz to over 1Moz, ssuming grade of 6gpt from the 8 holes. It sounds like SKE is fast trcking the drilling by not waiting for the next freeze-over.
GH11
--------------
Ridgeback wrote: Had a read of Taylor Dart's article. Lots of unknowns until drilling has updated the resource but I think they should rename this waste site and call it the " Pot O Gold".