7 1/2 holes drilled thus far.
In 2021, six holes totalling 3,711 metres have been completed, as of May 10. The program is currently operating with one drill rig, with plans to add a second rig in Q2.
Start of drill program March 15th.
So 56 days and they drilled 3711 metres or 66.26 metres every day.
We are 21 more days into the program so lets say 21 x 66.26 metres = 1392 metres or roughly 2 more full holes. And maybe just starting on the 9th hole.
But they say 3711 metres is 6 holes or cores , so each hole is approx. 620 metres or so.
All totalled they should have drilled thus far 8
Now 2nd rig Q2 , well Q2 ends at June 21st, Q3 starts on the 22nd of June.
They must have at least 6 cores into the lab by now, or 2 batches in my view.
Each batch in my view may be 3 cores at a time.