RE:RE:RE:RE:RE:RE:Throw Away LineYeah based on the quarterly production vs expected it looks like slightly more than 80% of the gold was preg robbed. Once you put preg robbing material on a leach pad the entire pad is no longer usable. Unless you just managed to put the carbonaceous material on a small portion of the pad and not over an entire level. They'll probably have to start a new leach pad or isolate the carbonaceous material on the current one and engineer around it. The reason they were crushing is because the gold recovery % is better with crushing. My guess is they are going to run of mine purely to conserve cash as they try to figure this out as it's the cheapest way to mine. There's a chance the mine will never be economic now though, depending on how widespread the carbonaceous material is through the deposit.