RE:RE:RE:RE:Additional permit requirements will delay start of Line 5About Line 5? Never! LOL. You said it about Line 3 and you know it and you were wrong!
Line 3 is a done deal and it is still pumping.
You moaned about Line 5 being shut down and it's still pumping strong.
FiddyFiddyOdds wrote: How long have I been saying it's not over till it's over ?????? And people laughed. So a few more years of a 68 year old pipeline operating. What could possibly go wrong ?
Watch the share price drop if she springs a leak, and watch Whitmer tell the world "I Told You So". I said a couple of weeks back that Line 3 took 1/2 a dozen plus years to get sorted out, and so will Line 5, and here we are.
Silkos wrote:"This is a blow.
I doubt that Whitmer had anything to do with it, this comes from all the way up.
That's the real blow."