Great Read and Technical Report by MINING PLUS CANADA Dated May 26, 2021
For those that like reading large reports. (Warning - it's almost a ream of paper. :)) Technical Report | Alexco Resource Corp. Some points 1.2.13 Economic analysis Starts - Page 1-19
1.2.14 CASH FLOW ANALYSIS
Considering the Project on a stand-alone basis, the undiscounted after-tax cash flow totals $189.7 M over the mine life.
Simple payback occurs approximately 15 months from start of production, approximately 10 months after the project start date of April 1, 2021.
**Perspective on extent of claim Page 4-4
7.3 MINERALIZATION Starts Page 7-6
MINING PLUS CANADA Suite 504, 999 Canada Place Vancouver, BC V6C 3T4 Canada File Reference: MP-8959_Alexco_Technical Report_Apr_2021 Signed and Stamped by Qualified Persons: Kourosh Tarighi, P.Eng. of Mining Plus Zach Allwright, P.Eng. of Mining Plus Hassan Ghaffari, P.Eng. of Tetra Tech Canada Inc. Paul Hughes, Ph.D., P.Eng. of Mining Plus Gilles Arseneau, Ph.D., P.Geo. of SRK Canada Inc. Cliff Revering, P.Eng. of SRK Canada Inc. Issue Date: May 26, 2021 Effective Date: April 1, 2021