PEA VS 43-101 The numbers on the 43-101 compared to the PEA are two different worlds. It is no wonder the NPV was disappointing.
Measured + Indicated 16,036,000 tons at 3.78 g/t for a total 1,946,100 oz. gold
PEA 2,400,000 tons at 5.13 g/t for a total 375,900 oz. gold