production reportNow would b the time to put that out. Along with a bunch of other stuff.
Like. R we full tilt shovelling? R we dewatering? R we drilling?
R we still getting a permit?
Well. I agree that waiting should have banked us some coin to not have to jv or stream.
My calc on the pee pee is that it cost me a q mill. I would like that back.
nf