The 2 first targeted wells were drilled mapped stem testedNot a lot of mystery here. Just the start of expanding gas fields close to the massive SASB gas discovery.
The Saturn Project will target the two discovered unproduced gas pools Alapli and Bayhanli, both of which were drilled, mapped, and drill stem tested +7 MMcf/d gas from similar 15 metres of perforated gas reservoirs. Both discover wells had an additional 4 to 5 gas reservoirs that were not tested adding further gas potential.