RE:Gerlitz grant of 550,000 options $ 11.39/sh SPEAKS VOLUMESI have to believe we will know the 2d seismic results of the area between 6-2 and 6-1 much sooner than September. They will have daily feedback from the 2d seismic. I would think they will start 2d between 6-2 and 6-1. They put in the road between 6-2 and 6-1 in March, after they had a good idea what was in 6-2. Remember they changed their plans of well 3 being southwest of 6-2. They are now waiting for initial 2d seismic to decide where to place the 3rd well.