RE:RE:RE:How does CNRL consistently achieve leading results. Your grasping at straws?, Kakwa has 1010 base plate gas processing, it is connect to both major gas transmission system and can switch between them.
It has 80,000 boe/day of condensate stablization, super pads, liquids handing, all redundant, all scaleable, and all paid for.
A single standalone gas plant connect to one pipeline, and limited water disposal does not compete, Managment needs to have a plan for hundreds of millions of dollars of infastructure they are leaving stranded, before building new green field infastructure that by the way no one is doing.
In fact Attachie will never produce 40,000 boe, it just can't with the resouce that is available and the plant they are proposing. A sink hole, management has put attachie ahead of the share holders.
IMHO