News - TOCVAN DRILLS 15.3 METERS OF 1.1 G/T AUThis is just another great hole which increased the overall value of TOC. As they keep the share structure tight, this can only get better. No wonder Derek has stated openly that they are looking at potential Joint Ventures and/or investment ($20M) to bring Pilar into production. A recent report compares Pilar to other mines in the area in a reference to TOC's share structure and what TOC could be potentially worth. Time to buy more and build a bigger position. And 3 more holes due, OTC listing, trench sampling, and the list goes on....
Tocvan drills 15.3 m of 1.1 g/t Au at Pilar
2021-07-27 05:58 ET - News Release
Mr. Brodie Sutherland reports
TOCVAN DRILLS 15.3 METERS OF 1.1 G/T AU IN NEW 4-TRENCH EXTENSION DEFINES NEW MINERALIZED TREND OVER A 500 METER STRIKE AT PILAR
Tocvan Ventures Corp. has released results for the next four drill holes from its phase 2 drill program at the Pilar gold-silver project in Sonora, Mexico. A Phase II drill program was completed in June with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for four drill holes from the 4-Trench target area are included in this release, highlighted by drill hole JES-21-53 which returned 15.3 meters at 1.1 g/t Au . The results from 4-Trench have defined a new mineralized trend 500 meters long adjacent to the established Main Zone (Figure 1). Three (3) drill holes from new target areas are pending results.