GREY:EPWCF - Post by User
Post by
7Twiggyon Jul 30, 2021 3:27pm
211 Views
Post# 33633189
From the CEO.CA Board
From the CEO.CA BoardSo I just took a drive to see the London location and just as I thought the space has been gutted a dividing wall added between units and the build out has started. The interior metal studs are up and I can see the interior rooms taking shape. Next up electrical then drywall,paint and flooring. Clinic should be open no later then 3 months. GLTA