RE:Generalities regarding timing of core, assay, 3D model, etc
thanks so much for your post. A lots of knowledge base. I had a Twitter chat back from Oroco's staff yesterday about the drilling penetration rate etc and got this information: 2+1 drills, 2 twelve hours shifts per day achieving 120 to 130 meters penetration daily. Target depth 750m. However, expect about 10 holes drilled per month because of the relocation and set up time between drilling locations. You may wish to incorporate these parameters in your equation. Best regards.