Kakwa Facilities Are ComplicatedUncut. I don't mean to pile on oe show disrespect. As you point out they have faced many challenges mostly of their own doing As to facilities the field operators are intact and the designs are in place. That's why we do as biultdrawings and keep a library of equipment manuals., And they kept the facility's engineer who built all of the plants and designed the super pads . No learning curve required beyond a three day field tour. That sanctioning doesn't prevent outside issues from affecting project schedule. Keep up the great comments!