GREY:NEVDQ - Post by User
Post by
nofluffon Sep 02, 2021 6:57pm
261 Views
Post# 33807583
the underground picture.
the underground picture.We have mined our 2nd 1.4% grade short stope. We r now advancing ne drift at design speed. We are ready to do a lower push through the water dyke to access a lower zone.
We will have the 2 surface fans installed q4 that will allow continous ramp up to 6500 tons per day. hoist. The experience gained on 1rst dyke push should speed second up dramatically.
Looking good pete!!
nf