Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Sokoman Minerals Corp V.SIC

Alternate Symbol(s):  SICNF

Sokoman Minerals Corp. is a discovery-oriented company with projects in Newfoundland and Labrador, Canada. Its projects include Moosehead Gold, Fleur de Lys, Grey River Gold, Kepenkeck Gold, Killick Lithium, Crippleback Lake Gold, Startrek and Iron Horse. Moosehead Gold property includes 98 claims totaling 2,450 hectares adjacent to the Trans-Canada Highway in central Newfoundland. Fleur de Lys project of 1,891 claims on the Baie Verte Peninsula of NW. Grey River property in southern Newfoundland includes 324 claims in seven licenses, centered on the community of Grey River. Kepenkeck gold project, located in central Newfoundland. Killick Lithium Project is in southwestern Newfoundland. Crippleback Lake Gold Project is in proximity to the Trans-Canada Highway in north-central Newfoundland. Startrek Property is located 20 kilometers (km) east of the town of Gander, Newfoundland and Labrador, Canada. Iron Horse project is located over 120 km northeast of Labrador City, Labrador.


TSXV:SIC - Post by User

Post by calicoon Sep 17, 2021 10:52am
111 Views
Post# 33877230

Just The Facts (e.g., 11.90 Metres & 44.96 g/t)

Just The Facts (e.g., 11.90 Metres & 44.96 g/t)

Great results so far in 20+ holes.

In March 2018, the Company initiated its 2018 program with Phase 1 diamond drilling commencing in June. Phase 1 consisted of a 1,970.5 m in 15 holes, which in late July resulted in a high-grade discovery in the Eastern Trend, an area with little previous drilling. Phase 1 Discovery Hole MH-18-01 returned 11.90 m @ 44.96 g/t Au from 109 m down-hole. Since then, Sokoman has completed five successful phases of diamond drilling, consistently returning high-grade results.

The Company is currently carrying Phase 6 diamond drilling program which started in September 2020, covering 10,000 m of drilling. A total of 4,009 metres in 15 holes has been completed to date testing target areas including three holes in the Western Trend (MH-20-111, 113 and 114) and 12 holes in the Eastern Trend. Drilling in the Western Trend focused on testing deeper portions of the zone and all three holes intersected structures with variable quartz veining with disseminated pyrite and arsenopyrite.
 
  • The project is 100%-owned and located in north-central Newfoundland, Canada’s newest hot mining spot.
  • Excellent infrastructure includes year-round road access via Trans-Canada Highway; one-hour drive to assay lab and drilling companies; abundant internal logging and drill roads; and provincial power sub-station 4 km west of property.
  • The project is a high-grade orogenic lode gold with high-grade boulders (>400g/t Au) discovered in 1980’s.
  • In 2018, Sokoman discovered a new high-grade zone open in all directions (Eastern Trend) 200 m east of Western Trend. Phase 1 Discovery Hole MH-18-01 (Eastern Trend) returned 11.90 m @ 44.96 g/t Au.
  • Subsequent to the first successful drilling program, Sokoman has completed another 4 phases of drilling with outstanding results highlighted below:
  • Phase 2:MH-18-39 returned 5.10 m @ 124.20 g/t Au, including 1.10 m @ 550.30 g/t Au
  • Phase 3:MH-19-62 cut 4.8 m of 33.59 g/t Au, including 0.90 m of 124.15 g/t Au
  • Phase 4:MH-19-81 cut 6.4 m of 17.34 g/t Au, including 1.45 m of 75.50 g/t Au
  • Phase 5:MH-20-86 cut 4.70 m of 18.60 g/t Au, including 1.85 m of 46.99 g/t Au (from 271.80 m downhole)
  • Phase 5:MH-20-82 cut 9.50 m of 5.70 g/t Au, including 1.70 m @ 29.19 g/t Au (from 206.50 m downhole)
  • The ongoing Phase 6 drilling program commenced in Q3 2020 and was originally planned at 10,000 m but, with sufficient financial resources now in place, has been increased to 50,000 m. A portion of Phase 6 will address the potential of the South Pond area which will include merging the winter magnetic survey with the new float samples.
The program has reported great results from several initial holes: In November 2020
  • MH-20-115 upper interval cut 4.60 m of 47.20 g/t Au (from 64.00 m downhole)
  • MH-20-115 lower interval cut 8.10 m of 68.70 g/t Au (from 111.20 m downhole)
  • MH-20-116 upper interval cut 1.80 m of 11.85 g/t Au (from 54.50 m downhole)
  • MH-20-116 lower interval cut 4.30 m of 2.94 g/t Au including 7.57 g/t Au over 1.25 m (from 183.80 m downhole)
Recent prospecting at South Pond
  • 400 m along strike to the SW of Eastern Trend, has located a cluster of angular quartz float with high-grade grab sample assay results ranging from 0.318 g/t Au to 157.04 g/t Au, as well as enriched silver values up to 36.2 g/t Ag.
  • DDH MH-20-123 returned 5.0 m averaging 26.88 g/t Au, including 2.15 m at 60.59 g/t Au from 47.0 m downhole*.
On January 29, 2021 Reported Results at Eastern Trend/Footwall Splay
  • MH-20-132 – 4.0 m at 24.92 g/t Au, incl. 1.60 m at 61.68 g/t Au from 70.50 m downhole
  • MH-20-127 – 1.30 m at 9.23 g/t Au, incl. 0.50 m @ 22.72 g/t Au from 48.90 m downhole
On February 23, 2021 Reported South Pond Zone hole assay results:
  • MH-21-141 – 4.20 m of 64 g/t Au, including 1.20 m at 223.63 g/t Au from 47.90 m downhole.
  • Further drilling intersected additional near-surface, high-grade gold mineralization at the Footwall Splay and South Pond Zones, as well as discovered a new, near-surface, mineralized structure at South Pond. Visible gold-bearing quartz veins were intersected in eight recently completed drill holes at the Footwall Splay, including the following three holes.
Footwall Splay and South Pond Results reported April 28, 2021
Footwall Splay
  • MH-21-157 – 3.50 m of 12.39 g/t Au, including 1.50 m of 28.57 g/t Au from 36.30 m downhole; MH-21-163 – 11.60 m of 21.07 g/t Au, including 5.10 m of 30.82 g/t Au from 44.0 m downhole; MH-21-166 – 5.10 m of 15.51 g/t Au, including 2.80 m of 27.68 g/t Au from 9.00 m downhole, (MH-21-166 collared in a visible gold-bearing quartz vein)
South Pond
  • MH-21-147 – 3.05 m of 16.54 g/t Au, including 0.85 m at 58.91 g/t Au from 72.40 m downhole
Footwall Splay/Eastern Trend, and South Pond Results May 18, 2021
Footwall Splay
  • MH-21-165 – 4.10 m of 21.61 g/t Au, including 2.10 m of 41.39 g/t Au from 79.70 m downhole
  • MH-21-164 – 4.05 m of 22.62 g/t Au, including 20.95 m of 5.15 g/t Au from 79.95 m downhole
South Pond
  • MH-21-152 – 3.00 m of 1.82 g/t Au, including 0.70 m of 3.08 g/t Au from 15.00 m downhole
  • MH-21-153 – 3.00 m of 1.61 g/t Au, including 1.60 m of 2.40 g/t Au from 12.00 m downhole
<< Previous
Bullboard Posts
Next >>