RE:RE:RE:Starting right before winter? Again?!
The mill was built 15 years ago I believe. These are the third operators? The biggest problem with the first and second... debt ,They thru everything thru the mill low grade(then almost waste 1250 an oz).Now at 1800 it's low grade . Instead of drill holes 25 meters, it's 9 meters , I believe. I can't remember Nordic having the professional folks planning the enlarged mine plans.