RE:RE:RE:RE:RE:Rig not up to taskProselenes wrote:
Royston was permitted to 10,700 feet. And they drilled to 10,700 feet.........as per the permit granted.
The rig was fine, and everything was done to plan.
You're saying that the drill was limited to 10700 feet I've only read that it was planned to that depth.
"
The primary target is the Herrera Gr7a and the Gr7bc sands at a depth of approximately 9,600 feet, and the well is planned to terminate in the Gr7bc formation at an estimated total measured depth of 10,700 feet "
The Herrera sands was about 100 feet deeper than pre drill expectations. Would have been interesting to go a little deeper but you could be right that 10700 feet could be the limit due to permitt and contractual obligations.