Renforth drills 21.85m of 3.06 g/t gold TheNewswire - October 6, 2021 - Renforth Resources Inc. (CNSX:RFR.CN) (OTC:RFHRF) (FSE:9RR) (“Renforth” or the “Company”) is pleased to announce the final results from our 2020/21 drill program at our wholly owned Parbec open pit gold deposit located in Malartic, Quebec, adjacent to the Canadian Malartic Mine, Canada’s largest gold mine. Assay results highlights appear below, including 21.85m of 3.06 g/t gold drilled in PAR-21-141, which was drilled as an “infill” drill hole, in an area which had not previously been drilled. At the end of the program the field geologists decided to follow up on the visual results of PAR-21-141, which terminated at a vertical depth of ~250m as can be seen in the vertical section below, with a shallow “overcut”, PAR-21-145.
As seen in the section PAR-21-141 delivered new mineralization outside of the conceptual pit shell. PAR-21-145, also delivering new mineralization, terminated at approximately 150m vertical depth, delivering highlights of 33m of 0.748 g/t gold, 19.5m of 1.09 g/t gold and 9.9m of 1.38 g/t gold. All of the assay data in these two holes is new mineralization, demonstrating continuity of mineralization at Parbec and extending mineralization to some depth.
https://finance.yahoo.com/news/renforth-drills-21-85m-3-120044392.html