RE:RE:NiceNotgnu wrote: Wrong Flounder... bad flipper flopper.
1,000 tons per day (meant to say)
100 tons per day = 30,386 cited below... have a look with they two top side eyes.
Approximately 30,386 tons of ore were processed yielding 682 tons of concentrate at an average grade of 22%, resulting in approximately 150 tons of copper production. The copper amount is re/ dev ore mixed in. The amount of drilling, blasting, mucking, crushing, lifting and grinding is still 3,386 tons in a month (1,000 tpd)
N
Fishbillion wrote: An improvement.... looks like sept was a 360 tpd mining rate ( 11,000/lbs per day).... so i have been close with my previous calcs..... this is 4 million lbs annulized ( about 6% of name plate). ... while progress is atleast in the right direction a lot of cash is required to get to a 3000 tpd mining rate.... a 3000 tpd mining rate will also not be ecomonic with the current debt load..... jimho.. . 25 days to go until the next news..... for those following on a calander.. still on at a pp of .35 -.4.... still hoping for the epic back - to - back 10:1