RE:newsWell this line about sums up their drill program LOL:
The 2021 drilling program provides the SCJV with the opportunity to investigate metallurgical performance enhancement. To expedite completion of the drilling program, the SCJV mobilized two drill rigs to site, however, unfavorable weather conditions impeded the ability to complete the full program in a safe manner, and as such a decision was taken to conclude drilling activity. Analytical results for the drill holes will be released when they become available, and we look forward to the start of the metallurgical testwork."
ONLY 835m drilled! I bet the longs must feel so dejected now at how poorly managed this whole thing has been. If they had started earlier maybe they could have gotten the 3000m drilled but didn't one poster pointed out that bad weather and snow were coming to the north? LOL