Talisker Intercepts High Grade Gold at BRX Brownfields DrilTalisker Intercepts High Grade Gold at BRX Brownfields Drill Program North of Bralorne and Increases to Seven Drill Rigs CANADAS NEXT TIER 1 EXPLORER Talisker Intercepts High Grade Gold at BRX Brownfields Drill Program North of Bralorne and Increases to Seven Drill Rigs Toronto, Ontario, November 9, 2021 - Talisker Resources Ltd. ("Talisker" or the "Company") (TSX:TSK | OTCQX:TSKFF) is pleased to announce high grade results from the brownfields BRX Project in drill hole SB-2021-068 highlighted by 407 g/t Au over 0.5 metre within 90.71 g/t Au over 2.25 metres at its 100% owned flagship Bralorne Gold Project. Talisker is also pleased to announce that it has increased the number of drills from five to seven including one RC drill focused on infill drilling at the Pioneer zone. Key Points: Hole SB-2021-068 intersected high grade mineralization on the brownfields BRX Project 5.5 kilometres northwest of the historic Bralorne Mine. Successful intersection of a new vein at the BRX Project highlighted by 407 g/t Au over 0.5m within 90.71 g/t Au over 2.25m. A broader zone of lower grade mineralization around the Why Not vein intercepted between 184.75 and 236.60 metres grading 0.44 g/t Au over 51.85m. The BRX Project is Taliskers first brownfields drill program along the 33 kilometre Bralorne trend. Historically, 10 veins have been defined on the BRX property. The most extensively developed vein, the California Vein, was mined to a depth of 600 metres and is described as a 2 metre wide quartz carbonate vein very similar in nature to the classical Bralorne crack and seal orogenic veins. Historic drilling at the BRX Project is highlighted by 5.65 g/t Au over 5.39m. Limited modern exploration has been conducted on the BRX Project. Terry Harbort, Taliskers President and CEO, stated, We are very pleased with our first high-grade brownfields results for the Bralorne trend. These encouraging results confirm the district nature of Bralorne and the significant upside potential outside of our current resource drillout area. The Bralorne Gold Project has a total of 47 gold showings over 33 kilometres. Talisker plans to expand its brownfield exploration in 2022 to focus on the Congress Project and Royalle Project. The Congress Project sits 16 kilometres north of the historic Bralorne Mine and consists of three defined veins, mined to a depth of 200 metres. Several highly prospective exploration targets are present on the ground including the Lou zone with historic drilling intersecting zones ranging from 1.4 to 4 metres with grades between 5 and 11 g/t Au. Eight separate vein zones have been identified away from the Congress and Lou zones. A non-complaint resource consists of 46,151 ounces in the indicated and 148,091 ounces in the inferred categories. The Company notes that a qualified person has not verified the data disclosed in respect of the property, including sampling, analytical and test data underlying this information. The Royalle Project sits directly south of the historic Bralorne-Pioneer Mine along strike of the Cadwaller Break and hosts eight exploration targets including mesothermal gold and silver veins and skarn style mineralization. The main target is the Piebiter zone with historic adit sampling returning gold grades of 4.3 g/t over 21 metres and selective grab samples of up to 227 g/t Au. The Chopper silver vein has been delineated for 2,400 metres and with selective grab samples up to 1,585 g/t Ag. The Company notes that these selected samples are not necessarily representative of the mineralization hosted on the property and limited drilling has been completed on the property. A qualified person has not verified the data disclosed in respect of the Property, including sampling, analytical and test data underlying this information. Seven diamond drill rigs are currently drilling at the Bralorne Gold Project. A total of 73,321 metres consisting of 135 holes of a planned and fully funded 100,000 metres drill program has been drilled at the project this year with a total of 96,027 metres (171 holes) since Talisker initiated drilling at the project in February 2020. 32 holes consisting of 14,611 samples are currently at the assay laboratory and are expected to be received by the Company shortly.