RE:We got 105 mt of at least 1.2% probably higherLike I have said many times and I'll say it one last time ,first of all the company themselves have stated that the .05-1% was estimates on the CONSERVATIVE SIDE.second if you go through old NRs you can see some charts that many grab samples were above 1% and grab samples from piles E&F turned up grades of .2.6% all the way up to 4.6% so some basic math would lead me to believe that an average of 1.2% is not a far stretch,coupled with the fact that the tailings come from the old AVZ tin mine which AVZ has turned up an average grade of 1.6 % so between the companies conservitve estimates ,the numerous grab sample grades,AVZ s numbers I'm sure I'm not that far off.I'm probably even on the low side.but that's my opinion everybody has their own ,but to me , only mine counts.