Hydrogen production at BRChttps://www.cbc.ca/news/canada/edmonton/alberta-carbon-capture-kenney-1.6253997
- Tidewater Midstream: BRC Integrated Steam Methane Reforming (SMR)-CCS-Cogeneration Project in Cynthia
Tidewater Midstream will build Alberta's first fully integrated blue hydrogen plant at the Brazeau River Complex, west of Drayton Valley.
The facility will use a CCS hydrogen production unit that converts methane to hydrogen, storing the resulting emissions underground. The plant will also introduce a 15-megawatt turbine with heat recovery steam generation. The overall project will cut about 31,000 tonnes of emissions each year, the province said.