RE:PFAS Landbased System $9.2 MillionVery different picture with different assumptions. Tossing 100s of millions and billions in revenue projections like it that easy. Some folk get pumped up and then they are disappointed when things are taking much longer than expected.
BIGMOE wrote: PFAS solution for 25 k people cost about $10 million. Both USA and Canada, I have estimated below with brekdown: - Waste Destruction System - $643.6 million over the next 2 years
- Land base system
- $9.2 million land-based system announced, plus two additional units $18.4 million possible in the near future
- Example – Town of Easton, MA Population 25 k (2018)
- $9.2 million contract for 25 k people and cleaning up PFAS.
- Land based system for Pyro is limitless and huge business over $100 billion just USA only.
- Population=330 million/25 k=13.2k*9.2m=$121.44 billions
- Assume two (2) projects per month for the next 24 months. $10 million/project*2*24months=$480 millions
- US Government will fund for all the projects and waiting for Congress to approve the spending bills.
- Canada – 63 locations for hotspot
- $9.2 million contract for 25 k people and cleaning up PFAS.
- Assume we need 4 units per locations
- Cost estimate over $2.3 billions
- Assume 5% of the contract materialize over 24 months
- Estimated about $116 millions