RE:Drill result mystery....Here are some of CNC drill results:
Notably, hole CR20-74 intersected 0.30% nickel over core length of 308 metres (estimated true width of 198 metres) starting at 196 metres downhole, including 0.41% nickel over core length of 13 metres at 271.5 metres downhole, and ended with 0.32% nickel over core length of 36 metres. The entire hole CR20-74 returned 0.28% nickel over core length of 453 metres - 850 northwest of current end of Higher Grade Core of Main Zone mineralization. Hole CR20-77 intersected 0.32% nickel over 90 metres starting at 144 metres downhole, including 0.41% nickel over core length of 12 metres starting at 177 metres downhole, and extends the Main Zone higher grade core by 100 metres to the west.
Complete assays from the first two holes in the western part of the West Zone confirm wide, lower grade mineralization more than 800 metres wide. Hole 20-69 returned 0.16% nickel over entire core length of 456 metres including 177 metres of 0.21% nickel. Hole 20-70 returned 0.17% nickel over entire core length of 495 metres including 41 metres of 0.21% nickel.