first impressions Some interesting developments.. Obviously, they came in with half the distance drilled in their plan… There was
some terrible weather. and crew shortages for other outfits so one can presume tudor had some too. It took them a while to assemble
a crew to get eureka drill turning… 2 kilometers from end of the goldstorm deposit to the end of the ice. The 10 meter height designation
for contours and the maps are a gold mine. That they framed the discovery of a new zone as a single item is a big deal. . I really liked the
placement of the goldstorm drill holes…. i/e/ extension to the DS5 stockwork zone… the pairing of their longest hole under the mountain.
Remember the hole that went for about a kilometer and they lost directional control of… hit barren rock but hit
good grade at the very end of it.. They paired that one… They did work on the DS5 stockwork towards the eureka end but not all the way to it..