RE:RE:RE:For CGX drilling teamHow ya gonna run a balanced cement plug to stop losses if you're not open ended with a stinger in the hole? Ya can't do it thru a BHA.
Sp dropped 7 cents today. You and shedrills just told the world that they're having losses in the production zone and have to cement the production zone off. The only way thst you can have losses in the production zone is if there is little pore pressure (hydrocarbons) there. And LCM, from your numerous SPE posts means lost circulation material like walnut shells, mica, sawdust etc. Pumping a cement balanced plug with open ended drill pipe is the very last resort but never in the production zone. Why would you want to cement off what you want to produce? Ok, you guys go ahead and continue to destroy the sp with your insane stuff. At least, Dfly deflected with a cut and paste. Out of here.