RE:RE:RE:RE:Thi$ has the Final SayAnother way to look at this is assume the share price is $0.50 CAD for simplicity and assume even with the mine permitted built and into production the share price will pontentially hit but never go above its previous ATH of $18 CAD.
The maxium an investor could lose is $0.50 per share if the company is unable/blocked from permitting or building the mine and the shares go to $0.
The maxium an investor can gain is $18 per share if the mine gets permitted, built and into production.
Assume its takes between 5 and 10 years to reach maxium potential.
The risk to reward ratio heavily favor reward.
I used a basic risk/reward ratio calculator and the risk reward ratio is 1:35