RE:31.0m averaging 3.9 g/t Pt, 5.1 g/t Pd, 1.7% Cu, 0.63% Ni. Nice results .
nice update also . I'm hanging around for at least a few more months ... I want to see the results from this program ...
Up to 16,000m of drilling is also planned to commence in mid-January 2022 on frozen muskeg to follow up on certain discrete geophysical anomalies. These may represent the occurrence of low resistivity, high conductivity massive sulphide material at the base of the Escape and Current deposits within the Escape Lake Fault Zone corridor, consistent with the Norilsk mineral deposit model used by the Company in Thunder Bay North magma conduit system."