RE:Labs"The New Vein System was intersected by hole SD-21-81 at the top end and continues for over 80 metres to hole SD-21-58, the last hole drilled in 2021.
Mineralization in Hole SD-21-58 is visible over 25 metres and the Company is eagerly awaiting the assay results from this hole."