RE:Drills Single Longest Continuous Clay Intercept EverWhile the claystone intercept length is potentially impressive it does NOT guarantee that there is "continuous" lithium bearing grades within it.
I would be more comfortable if SPMT had published the locations of the new holes as well. I assume they are located somewhere in the void of information between holes 11,12,13.
The model in the 43-101 rpt (figs 14-7 & 14-8) appears to heavily rely on continuity between holes 11 and 12. IMO this is a bit of a stretch. They definitely need infill drilling to confirm this.
Rockaur